DocumentCode :
2596457
Title :
The TeliaSonera Green room Concept for high and mid density ICT equipment
Author :
Enlund, Svante ; Lundén, Dag
Author_Institution :
BA Broadband Services, Technol. Solutions, TeliaSonera, Stockholm, Sweden
fYear :
2011
fDate :
9-13 Oct. 2011
Firstpage :
1
Lastpage :
5
Abstract :
This paper and presentation aims at present an new concept for construction and cooling of mid and high density equipment (>;10 kW/rack), often located in designated areas in Data Centers. Several of the highlighted solutions has not been invented by TeliaSonera however the concept to combine several of the different solutions in one location and then perform actual verification tests and energy/cooling optimization has not to our knowledge been performed before and that\´s why we have choosen to call this approach "The TeliaSonera Green room Concept". The concept includes al infrastructure at a site such as power, back up and cooling but in this paper we only focus on the cooling part.
Keywords :
computer centres; cooling; optimisation; telecommunication power supplies; TeliaSonera green room; back up power; data centers; energy/cooling optimization; high density ICT equipment; mid density ICT equipment; verification tests; Meteorology; Neodymium; Climate; Data Center; Data rack; Freecooling; High-Density; Indirect freecooling; Mid-Density; SEE Cooler; SEE Cooler HDZ;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Telecommunications Energy Conference (INTELEC), 2011 IEEE 33rd International
Conference_Location :
Amsterdam
ISSN :
2158-5210
Print_ISBN :
978-1-4577-1249-4
Electronic_ISBN :
2158-5210
Type :
conf
DOI :
10.1109/INTLEC.2011.6099867
Filename :
6099867
Link To Document :
بازگشت