Title :
Branched cable circuits testing: meeting a new challenge
Abstract :
Branched cable circuits and long cables cannot be accurately tested using reflectometry. Therefore, a multi-ended, GPS synchronized measuring system has been developed. This new method is now being introduced to US Utilities to diagnose cables up to 25000 feet in length, and branched cable circuits containing PILC, extruded cables or a combination of both types
Keywords :
Global Positioning System; insulation testing; partial discharge measurement; power cable insulation; power cable testing; synchronisation; PILC cables; US Utilities; VLF PD testing; branched cable circuits testing; extruded cables; long cables; multi-ended GPS synchronized measuring system; partial discharge measurement; very low frequency partial discharge detection; Circuit testing; Costs; Frequency; Maintenance; Partial discharge measurement; Partial discharges; Performance evaluation; Power cables; Pulse measurements; System testing;
Conference_Titel :
Transmission and Distribution Construction, Operation and Live-Line Maintenance Proceedings. 2000 IEEE ESMO - 2000 IEEE 9th International Conference on
Conference_Location :
Montreal, Que.
Print_ISBN :
0-7803-6625-5
DOI :
10.1109/TDCLLM.2000.882800