Title :
Study of Waterproof Technology about the Operation of Shield Tunnel in Shanghai
Author :
Rong, Shi ; YueLei, He ; Yan, Yang
Author_Institution :
Coll. of Urban Railway Transp., Shanghai Univ. of Eng. Sci., Shanghai, China
Abstract :
This article analysis the tunnel water leakage characteristics of the Trial operation of Shanghai Metro on the 7th line. Pointed out that the causes of disease, there are four main areas - engineering design, construction, project supervision, operations environment. Depth analysis of the key of the operations of leakage is segment structural cracks, surface subsidence, segment shrink, protected area management, train vibration and other factors and corresponding measures proposed water.
Keywords :
construction; cracks; design engineering; shrinkage; tunnels; vibrations; waterproofing; Shanghai; construction; depth analysis; engineering design; operations environment; project supervision; segment shrink; shield tunnel; structural cracks; surface subsidence; train vibration; tunnel water leakage; waterproof technology; Convergence; Diseases; Geology; Maintenance engineering; Materials; Monitoring; Soil; shield tunnel; tunnel waterproof; water leakage;
Conference_Titel :
Measuring Technology and Mechatronics Automation (ICMTMA), 2011 Third International Conference on
Conference_Location :
Shangshai
Print_ISBN :
978-1-4244-9010-3
DOI :
10.1109/ICMTMA.2011.674