• DocumentCode
    2632468
  • Title

    Methodology for the identification of latent problems on functioning equipment

  • Author

    De Stefano, F. ; Cafaro, R. ; Fusacchia, S. ; Marini, I.

  • Author_Institution
    Telecom Italics, Itlay
  • fYear
    2000
  • fDate
    2000
  • Firstpage
    58
  • Lastpage
    64
  • Abstract
    The conversion equipment acquired by Telecom Italia is the object of a series of controls and checks carried out to maintain unaltered in time the quality of the services furnished. The reports of the maintenance activities constitute a valuable part of the data whose examination allows the opportune identification of the latent critical difficulties of the equipment. Next to this “traditional method”, Telecom Italia has elaborated, together with manufacturers, a methodology which allows the identification of latent critical difficulties before they may present themselves in the form of breakdown. As a kind of example, a real case of system check-up, undertaken by the provider Installazioni Impianti is discussed
  • Keywords
    maintenance engineering; power convertors; telecommunication power supplies; Installazioni Impianti; Telecom Italia; functioning equipment; latent problems identification; maintenance activities; power conversion equipment; system check-up; Batteries; Circuit testing; Electric breakdown; Management training; Manufacturing; Personnel; Preventive maintenance; Rectifiers; System testing; Telecommunication control;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Telecommunications Energy Conference, 2000. INTELEC. Twenty-second International
  • Conference_Location
    Phoenix, AZ
  • Print_ISBN
    0-7803-6407-4
  • Type

    conf

  • DOI
    10.1109/INTLEC.2000.884228
  • Filename
    884228