DocumentCode :
2644760
Title :
An approach of PI gain scheduling with hysteresis switching for the control of boiler drum level in the coal-fired power generation units
Author :
Bi, Zhenfu ; Pan, Yuezhi ; Zhang, Qiang ; Wang, Fusheng
Author_Institution :
Department of Instrument and Control at Shandong Electric Power Research Institute, Jinan, 250002 China
fYear :
2006
fDate :
4-6 Oct. 2006
Firstpage :
1517
Lastpage :
1521
Abstract :
An approach, where hysteresis switching logic is used in gain scheduling of PI controller, is proposed and applied practically in the control of boiler drum level of 4× 300MW coal-fired power generation units. The parameterized candidate PI controllers are designed at a number of operating points based on on-site engineering tuning/tests, and, hysteresis switching logic, which is shown theoretically can be used with the aim that switching stops in finite time, is applied to make controller decision over those candidate PI controllers. The unit generation output is used as scheduling variable by the hysteresis switching logic. The proposed controller structure is used to control drum level of 4×300MW coal-fired power generation units at Zouxian Power Generation Inc, P.R.China.
Keywords :
Algorithm design and analysis; Boilers; Computational modeling; Control nonlinearities; Hysteresis; Logic; Power engineering and energy; Power engineering computing; Power generation; Testing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Computer Aided Control System Design, 2006 IEEE International Conference on Control Applications, 2006 IEEE International Symposium on Intelligent Control, 2006 IEEE
Conference_Location :
Munich, Germany
Print_ISBN :
0-7803-9797-5
Electronic_ISBN :
0-7803-9797-5
Type :
conf
DOI :
10.1109/CACSD-CCA-ISIC.2006.4776866
Filename :
4776866
Link To Document :
بازگشت