Title :
Full scope risk monitor for the transmission grid
Author :
HlavaÌcÌŒ, Pavol ; KovaÌcs, ZoltaÌn ; SÌŒpok, Marek ; Kubala, Milan ; Cerman, Anton
Author_Institution :
RELKO Ltd., Bratislava, Slovakia
Abstract :
The full scope risk monitor is a real-time analysis tool used to determine the instantaneous risk of technology based on actual status of its systems and components. The full scope risk monitor is based on the as-built, operated, and maintained configuration and reflects component statuses (e.g., any components out-of-service for maintenance or test). It is consistent with the PSA model (Probabilistic Safety Assessment). The risk monitor provides the ability to easily examine past operating practices, current plant conditions, and future planned activities (e.g., maintenance schedules). This is accomplished by providing an easy-to-use interface that is consistent with terminology and nomenclature familiar to the staff. It makes the PSA model and resulting insights available to non-PSA analysts. The result is a staff who is risk aware and more thoroughly considers impacts to safety from its past, current, and planned activities.
Keywords :
electrical maintenance; electrical safety; power grids; power transmission; PSA model; nonPSA analysts; probabilistic safety assessment; real-time analysis tool; risk monitoring; transmission grid; Maintenance engineering; Monitoring; Power supplies; Power system stability; Reliability; Safety; Substations; maintenance and test outage; probabilistic safety assessment; risk monitor;
Conference_Titel :
Electric Power Engineering (EPE), Proccedings of the 2014 15th International Scientific Conference on
Conference_Location :
Brno
DOI :
10.1109/EPE.2014.6839498