• DocumentCode
    273383
  • Title

    Total C and I refurbishment of a 4×500 MW coal fired power station for improved flexible operation using a touch screen based control desk

  • Author

    Wallace, J.N. ; Clarke, R.

  • Author_Institution
    CEGB, Berkeley, UK
  • fYear
    1988
  • fDate
    7-8 Nov 1988
  • Firstpage
    103
  • Lastpage
    109
  • Abstract
    The Didcot power station is situated near Oxford and operates four coal fired boiler/turbine units, with a generation capacity of 500 MW per unit. The authors describe the refurbishment of the control and instrumentation (C and I) system using computer based desk technology with touch screens. This improves flexible operation and also saves time
  • Keywords
    boilers; power station computer control; thermal power stations; touch sensitive screens; 2000 MW; C and I refurbishment; Didcot power station; boiler/turbine units; coal fired power station; computer based desk technology; control system; instrumentation system; touch screen based control desk;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Refurbishment of Power Station Electrical Plant, 1988. International Conference on
  • Conference_Location
    London
  • Print_ISBN
    0-85296-371-8
  • Type

    conf

  • Filename