• DocumentCode
    273409
  • Title

    On site testing of protection and automatic switching equipment in 275 and 400 kV substations

  • Author

    Laycock, W.J.

  • Author_Institution
    CEGB, Berkley, UK
  • fYear
    1989
  • fDate
    11-13 Apr 1989
  • Firstpage
    27
  • Lastpage
    29
  • Abstract
    Protection performance is dependent on the availability of accurate and reliable protection relays and their connection to high quality measuring transformers and well designed tripping systems. But it is only in the substation that all elements of protection systems are brought together during site installation and hence can be tested for the first time. The author describes the re-examination of on site testing requirements and methods undertaken during CEGB reorganisation. He shows that the introduction of new technology and increasing system utilisation factor has been fully taken into account
  • Keywords
    power system protection; substations; switchgear testing; 275 kV; 400 kV; on site testing; power system protection; protection relays; substations; switchgear testing; tripping systems; utilisation factor;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Developments in Power Protection, 1989., Fourth International Conference on
  • Conference_Location
    Edinburgh
  • Type

    conf

  • Filename
    20606