• DocumentCode
    274115
  • Title

    Channel Tunnel Shuttle locomotives, an overview of the design process

  • Author

    May, C.C. ; Phillips, C.R.G.

  • fYear
    1989
  • fDate
    25-28 Set 1989
  • Firstpage
    408
  • Lastpage
    412
  • Abstract
    The authors discuss the factors affecting design and selection of the locomotives for the Channel Tunnel. The main factors considered are the tunnel infrastructure and the operating performance requirements. The authors concentrate on the installed power, mechanical parts and reliability
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Main Line Railway Electrification, 1989., International Conference on
  • Conference_Location
    York
  • Type

    conf

  • Filename
    51912