• DocumentCode
    2744274
  • Title

    Production planning architectures: a common framework for the comparison of MRP II OPT, JIT

  • Author

    Villa, A.

  • Author_Institution
    Dipartimento di Tecnologia e Sistemi di Produzione, Politecnico di Torino, Italy
  • fYear
    1990
  • fDate
    21-23 May 1990
  • Firstpage
    526
  • Lastpage
    530
  • Abstract
    The possibility of integrating two or more of three methods for planning production schedulers, namely, MRP II (product-structure-based), OPT (process-structure-based), and JIT (product-delivery-dependent), is discussed. It has been verified that each method has merits and defects, and that, from this point of view, the three show complementarity. It is suggested that such integration is possible only if a well-assessed mathematical formulation can be stated and used for modeling all three methods in terms of alternative approximate solutions of the same optimization problem. Such a mathematical formulation is outlined
  • Keywords
    production control; scheduling; stock control; JIT; MRP II; OPT; just-in-time; manufacturing resource planning; modeling; optimised production technology; production control; production planning architectures; scheduling; Job shop scheduling; Manufacturing systems; Materials requirements planning; Mathematical model; Optimization methods; Optimized production technology; Performance analysis; Process planning; Production planning; Production systems;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Computer Integrated Manufacturing, 1990., Proceedings of Rensselaer's Second International Conference on
  • Conference_Location
    Troy, NY
  • Print_ISBN
    0-8186-1966-X
  • Type

    conf

  • DOI
    10.1109/CIM.1990.128156
  • Filename
    128156