DocumentCode
2759614
Title
A Quantitative Method to Determine the Size of the Stock Buffer in front of the Bottleneck under Multi-Product
Author
Ye, Taofeng ; Han, Wenmin
Author_Institution
Sch. of Econ. & Manage., Jiangsu Univ. of Sci. & Technol., Zhenjiang
Volume
2
fYear
0
fDate
0-0 0
Firstpage
7239
Lastpage
7243
Abstract
This paper describes a new method on determining the optimal size of the buffer, which is used to accommodate disruptions in production process and provide maximum throughput of the production system. The new method is based on thoroughly considering seven factors that influenced the determination of the stock buffer under multi-product. Furthermore, to validate the proposed buffer determination model, an example is illustrated and a simulation model is also developed
Keywords
production planning; buffer determination model; constraint theory; multiproduct; production process; stock buffer; Capacity planning; Constraint theory; Distributed Bragg reflectors; Fluctuations; Materials requirements planning; Optimized production technology; Production systems; Protection; Technology management; Throughput; bottleneck; buffer; multi-product; theory of constraints;
fLanguage
English
Publisher
ieee
Conference_Titel
Intelligent Control and Automation, 2006. WCICA 2006. The Sixth World Congress on
Conference_Location
Dalian
Print_ISBN
1-4244-0332-4
Type
conf
DOI
10.1109/WCICA.2006.1714491
Filename
1714491
Link To Document