• DocumentCode
    276273
  • Title

    A study of ±500 kV, 2400 MW compact converter station

  • Author

    Lebow, M.A. ; Fletcher, D.E. ; Mauro, R. ; Harrison, R.E. ; Gordon, D.L.

  • Author_Institution
    Consolidates Edison Co., New York Inc., NY, USA
  • fYear
    1991
  • fDate
    17-20 Sep 1991
  • Firstpage
    165
  • Lastpage
    170
  • Abstract
    Consolidated Edison has been involved in a number of research projects aimed at the development and demonstration of HVDC equipment for use in urban environments. The most notable of these projects has been the installation, in conjunction with EPRI, of a compact HVDC station in Astoria, New York. The Astoria experiment was recently concluded. Here , the authors describe how, as part of Consolidated Edison´s ongoing program to assure the availability of transmission equipment to meet its possible future needs, work was carried out in 1989 to develop a conceptual design of this 2400 MW HVDC compact terminal station based on available equipment suitable for installation in New York City. The study also identified areas where additional research could reduce the cost or space requirements of the installation
  • Keywords
    DC power transmission; design engineering; project engineering; substations; 2400 MW; 500 kV; EPRI; HVDC; USA; availability; cost; design; development; installation; research projects; substations; transmission;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    AC and DC Power Transmission, 1991., International Conference on
  • Conference_Location
    London
  • Print_ISBN
    0-85296-517-6
  • Type

    conf

  • Filename
    153898