• DocumentCode
    276478
  • Title

    An algorithm for load shedding and restoration during reduced generation periods

  • Author

    Wong, Kit Po ; Lau, Buon Sing

  • Author_Institution
    Western Australia Univ., Nedlands, WA, Australia
  • fYear
    1991
  • fDate
    5-8 Nov 1991
  • Firstpage
    521
  • Abstract
    During periods of reduced generation which occur as a result of industrial actions or of insufficient generation capacity load circuits are shed to maintain balance in generation and demand. In attempts to supply power to consumers fairly, circuits are taken out of service, and then restored, in a rotational manner. The manual process of decision making to shed and to restore loads my not lead to a fair power supply to consumers. the authors examine the main requirements and constraints in the operation during these periods. They develop an algorithm, which includes the main operational constraints, for shedding and restoration based on strategies for selecting circuits. The algorithm is implemented using the PROLOG language. Results obtained by applying the developed software system to a reduced generation period in a sample system lasting six hours are presented
  • Keywords
    expert systems; load shedding; power system computer control; power system restoration; PROLOG; algorithm; constraints; decision making; demand; digital control; expert systems; generation capacity; load shedding; power system restoration; reduced generation periods; software;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Advances in Power System Control, Operation and Management, 1991. APSCOM-91., 1991 International Conference on
  • Conference_Location
    IET
  • Print_ISBN
    0-86341-246-7
  • Type

    conf

  • Filename
    154128