DocumentCode :
278253
Title :
A user´s experience in the control and operation of combined cycle power plants
Author :
O´Brien, D. ; Ryan, B.
fYear :
1991
fDate :
16-16 April 1991
Firstpage :
42461
Lastpage :
42464
Abstract :
The Irish Electricity Supply Board´s operational experience with combined cycle power plants began early in 1979 at Marina, Cork. The plant comprises an 85 MW Frame 9001B gas turbine repowering a 1954 Siemens 30 MW steam turbine using a CMI unfired heat recovery boiler. Excellent performance of the Marina plant prompted the installation of a further plant at North Wall, Dublin in 1982. The North Wall plant consists of a 104 MW Frame 9001E gas turbine repowering three 16 MW BBC steam turbines (also of 1950s vintage), using a similar CMI boiler. The authors outline practical experience of the control and operation of these plants.<>
Keywords :
combined cycle power stations; gas turbines; power station control; 104 MW; 16 MW; 30 MW; 85 MW; BBC steam turbines; CMI unfired heat recovery boiler; Cork; Dublin; Frame 9001B gas turbine; Frame 9001E gas turbine; Irish Electricity Supply Board; Marina; North Wall; Siemens 30 MW steam turbine; combined cycle power plants; control; operation; Gas turbines;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Control Systems for Combined Cycle Gas Turbines, IEE Colloquium on
Conference_Location :
London, UK
Type :
conf