    Multi-points synchronous measurement of pressure used in burst and leakage monitoring along the water transmission pipeline

  • Author

    Lu, Shaoming ; Liu, Zhe ; Li, Shaowen

  • Author_Institution
    Dept. of Environ. Sci. & Eng., South China Univ. of Technol., Guangzhou, China
  • fYear
    2011
  • fDate
    15-17 July 2011
  • Firstpage
    2312
  • Lastpage
    2317
  • Abstract
    When bursted, the flow can reach hundreds to thousands of cubic meters within a few minutes on large-scale pipelines whose water supply capacity is 5-10 m3/s. It could trigger secondary disasters in the densely populated areas. But the accident is hard to be monitored and be found, because the leakage flow is often only 1% to 5% of the water supply capacity. This paper presents the synchronous measurement for the burst and leakage monitoring along the pipelines. The research found that it can alarm timely in 3min ~ 5min and provide key information such as detonation location and the amount of the explosion leakage. The method has been applied to Xijiang River Diversion Project in China and the water supply capacity is 3.5 million m3/d(40.5m3/s).
  • Keywords
    monitoring; pipelines; pressure measurement; water supply; China; Xijiang river diversion project; burst monitoring; detonation location; explosion leakage; leakage flow; leakage monitoring; multipoints synchronous measurement; pressure measurement; water supply capacity; water transmission pipeline; Accidents; Accuracy; Fluid flow measurement; Monitoring; Pipelines; Pressure measurement; Transmitters; burst; leakage; pipelines; water pressure; water supply capacity;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Mechanic Automation and Control Engineering (MACE), 2011 Second International Conference on
  • Conference_Location
    Hohhot
  • Print_ISBN
    978-1-4244-9436-1
  • Type

    conf

  • DOI
    10.1109/MACE.2011.5987443
  • Filename
    5987443