• DocumentCode
    280357
  • Title

    Strategic issues: the life-cycle of medium/large KBS engineering projects

  • Author

    Ringland, G.A.

  • Author_Institution
    Dept. of Inf., Rutherford Appleton Lab., Chilton, UK
  • fYear
    1990
  • fDate
    33154
  • Firstpage
    42552
  • Lastpage
    42555
  • Abstract
    Any software project should be organized; particularly if the project has a duration greater than six months or an effort level greater than three man-months, the organization should correspond to a clearly understood life-cycle. The stereotypical life-cycles for conventional software engineering (the waterfall model) and for knowledge engineering (rapid prototyping) are compared and critiqued. A life-cycle model is proposed and the results of its application in a medium/large KBS application in the utilities area is discussed
  • Keywords
    knowledge based systems; knowledge engineering; public utilities; software engineering; clearly understood life-cycle; conventional software engineering; effort level; knowledge engineering; life-cycle model; medium/large KBS application; medium/large KBS engineering projects; rapid prototyping; software project; stereotypical life-cycles; utilities area; waterfall model;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Strategic Research Issues in AI in Engineering, IEE Colloquium on
  • Conference_Location
    London
  • Type

    conf

  • Filename
    190598