• DocumentCode
    280412
  • Title

    The advantages of knowledge based techniques in pump scheduling

  • Author

    Likeman, M.

  • Author_Institution
    Dept. of Comput. Sci., Reading Univ., UK
  • fYear
    1990
  • fDate
    33168
  • Firstpage
    42461
  • Lastpage
    42463
  • Abstract
    Describes a knowledge based technique for pump scheduling that has been developed at BHR Group, and discusses its advantages over more traditional methods of pump scheduling based on operations research
  • Keywords
    knowledge based systems; scheduling; water supply; BHR Group; knowledge based systems; operations research; pump scheduling; water distribution networks; water supply;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Control and Optimisation Techniques for the Water Industry: II, IEE Colloquium on
  • Conference_Location
    London
  • Type

    conf

  • Filename
    190679