DocumentCode
28105
Title
Productivity Estimation to Diagnosis Support in Bauxite Open-pit Mine Using Fuzzy Logic
Author
Silva, Maria Daniely B. ; Mattos Affonso, Carolina ; Cavalcante, Kassia Cristina S. ; Picanco, Francisco Eduardo L.
Author_Institution
Miner. Paragominas S.A., Brazil
Volume
12
Issue
8
fYear
2014
fDate
Dec. 2014
Firstpage
1595
Lastpage
1601
Abstract
This paper proposes a methodology to estimates the productivity and support the diagnosis in an open-pit mine using fuzzy logic. The variables used in the estimation process are: loading queues, dumping queues, relocation time and cycle time. After the estimation, a detailed analysis of the unproductive hours is applied in order to identify which fuzzy rules are active. The results shows which key performance indicators (KPIs) are responsible for the low productivity in the mine. Then, it is possible to establish actions aiming to maximize productivity and reduce operational costs in the mine. The proposed method was applied on Paragominas mine located in the east of the state of Para, Brazil.
Keywords
cost reduction; fuzzy reasoning; mining; performance evaluation; production engineering computing; productivity; KPI; Para Brazil; Paragominas mine; bauxite open pit mining; diagnosis support; dumping queues; fuzzy logic; fuzzy rules; key performance indicators; loading queues; operational cost reduction; productivity estimation; relocation time; Abstracts; Estimation; Fuzzy logic; Global Positioning System; Monitoring; Productivity; Software; Mine productivity; fuzzy logic; mine production management; open-pit mine;
fLanguage
English
Journal_Title
Latin America Transactions, IEEE (Revista IEEE America Latina)
Publisher
ieee
ISSN
1548-0992
Type
jour
DOI
10.1109/TLA.2014.7014533
Filename
7014533
Link To Document