DocumentCode :
2838645
Title :
Project management system for C-DOT
Author :
Umashankar, V. ; Hari, G. ; Sivasubramanian, P. ; Rajagopalan, S.
Author_Institution :
Sneha Corp., Bangalore, India
fYear :
1989
fDate :
22-24 Nov 1989
Firstpage :
987
Lastpage :
990
Abstract :
The authors describe a project management system that offers direct access to powerful project management tools, providing accurate and timely status reports, rapid recalculation of project schedules, and powerful resource and cost tracking capabilities. The projects in a large research organization are massive in terms of the amount of work and the number of people involved. There are many complex, interrelated activities going on simultaneously. An effective method of planning, scheduling and controlling these activities is essential for successful implementation of projects without cost and time overruns. A description is given of the different types of information required by various activities at the authors´ research firm C-DOT
Keywords :
microcomputer applications; project engineering; scheduling; C-DOT; cost overruns; cost tracking; planning; project management system; project schedules; rapid recalculation; resource tracking; status reports; time overruns; Computer architecture; Costs; Database systems; Hardware; Information management; Microcomputers; Product development; Project management; Scheduling; Testing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
TENCON '89. Fourth IEEE Region 10 International Conference
Conference_Location :
Bombay
Type :
conf
DOI :
10.1109/TENCON.1989.177096
Filename :
177096
Link To Document :
بازگشت