DocumentCode
2838645
Title
Project management system for C-DOT
Author
Umashankar, V. ; Hari, G. ; Sivasubramanian, P. ; Rajagopalan, S.
Author_Institution
Sneha Corp., Bangalore, India
fYear
1989
fDate
22-24 Nov 1989
Firstpage
987
Lastpage
990
Abstract
The authors describe a project management system that offers direct access to powerful project management tools, providing accurate and timely status reports, rapid recalculation of project schedules, and powerful resource and cost tracking capabilities. The projects in a large research organization are massive in terms of the amount of work and the number of people involved. There are many complex, interrelated activities going on simultaneously. An effective method of planning, scheduling and controlling these activities is essential for successful implementation of projects without cost and time overruns. A description is given of the different types of information required by various activities at the authors´ research firm C-DOT
Keywords
microcomputer applications; project engineering; scheduling; C-DOT; cost overruns; cost tracking; planning; project management system; project schedules; rapid recalculation; resource tracking; status reports; time overruns; Computer architecture; Costs; Database systems; Hardware; Information management; Microcomputers; Product development; Project management; Scheduling; Testing;
fLanguage
English
Publisher
ieee
Conference_Titel
TENCON '89. Fourth IEEE Region 10 International Conference
Conference_Location
Bombay
Type
conf
DOI
10.1109/TENCON.1989.177096
Filename
177096
Link To Document