• DocumentCode
    2851748
  • Title

    To solve train-set scheduling problem with considering the inspection capacities of multi-depots

  • Author

    Caichun Zhang ; Wei Hua ; Jianhua Chen ; Liang Zhu

  • Author_Institution
    Sch. of Traffic & Transp., Beijing Jiaotong Univ., Beijing, China
  • fYear
    2009
  • fDate
    17-17 Oct. 2009
  • Firstpage
    276
  • Lastpage
    280
  • Abstract
    The cost of one train-set is very expensive, so how to minimize the amount of train-sets in use is more critical especially under this new round of economic crisis. Consequently, the train-set operation plan has better to program together with its inspection plan, not to be scheduled by different departments. Hence, the inspection capacities of related depots must be considered as programming the train-set operation plan. Under the regulation of China Railway High-speed (CRH) train-set, a new model is presented to solve train-set scheduling problem which considers the inspection capacities of multi-depots. Several schedulings for the Jing-Jin dedicated passenger line are programmed and the results show that train-set scheduling differs greatly from traditional railway operation and more train-sets are needed than the expectation, but by relaxing the inspection limits, the amount of train-sets in use will decrease.
  • Keywords
    industrial economics; inspection; production planning; railway industry; scheduling; China Railway High-speed train-set; economic crisis; inspection capacity; inspection plan; multidepots; passenger line; railway operation; train-set operation plan; train-set scheduling; ant algorithm; depot; inspection capacity; scheduling; train-set;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Advanced Forum on Transportation of China (AFTC 2009), 5th
  • Conference_Location
    Beijing
  • ISSN
    0537-9989
  • Type

    conf

  • DOI
    10.1049/cp.2009.1628
  • Filename
    5499199