DocumentCode
2852685
Title
Enhancing tool availability in the forging industry by adjusting PPC and tool maintenance
Author
Selaouti, A. ; Baumgarten, S. ; Potthast, J. -M ; Nickel, R.
Author_Institution
Dept. of Logistics, Inst. of Integrated Production Hannover gGmbH, Hannover, Germany
fYear
2011
fDate
6-9 Dec. 2011
Firstpage
96
Lastpage
100
Abstract
The day-to-day business of the forging industry is characterized by fluctuating order quantities and production of numerous variants. Within the framework of the Collaborative Research Centre (CRC) 489 “Process chain for the manufacturing of precision forged high performance components” a simulation based approach was developed for the implementation of operative tool management to reduce delays caused by the allocation of tools.
Keywords
forging; machine tools; maintenance engineering; production planning; reliability; Collaborative Research Centre; PPC adjustment; day-to-day business; forging industry; operative tool management; precision forged high performance component manufacturing; process chain; tool allocation; tool availability enhancement; tool maintenance; Availability; Companies; Delay effects; Inspection; Logistics; Resource management; Forging Industry; Production Planning and Control (PPC); Tool Maintenance;
fLanguage
English
Publisher
ieee
Conference_Titel
Industrial Engineering and Engineering Management (IEEM), 2011 IEEE International Conference on
Conference_Location
Singapore
ISSN
2157-3611
Print_ISBN
978-1-4577-0740-7
Electronic_ISBN
2157-3611
Type
conf
DOI
10.1109/IEEM.2011.6117886
Filename
6117886
Link To Document