• DocumentCode
    2852941
  • Title

    A math-heuristic approach for integrated resource scheduling in a maritime logistics facility

  • Author

    Chen, Hua Xing ; LAU, Hoong Chuin

  • Author_Institution
    Sch. of Inf. Syst., Singapore Manage. Univ., Singapore, Singapore
  • fYear
    2011
  • fDate
    6-9 Dec. 2011
  • Firstpage
    195
  • Lastpage
    199
  • Abstract
    This paper addresses a real-world integrated logistics problem involving the servicing of vessels in a maritime logistics facility. It can be modeled as a job shop problem in which the operations of a job require not only a single machine, but also a set of equipment to be processed plus a large number of side constraints. We decompose the problem into a machine scheduling problem and an equipment allocation problem. The former sub-problem is solved heuristically that prune the solution space for the latter equipment allocation problem, which is solved by an exact mathematical model. We run this math-heuristic approach on a set of real industrial test cases and benchmark the results against a conventional heuristic approach.
  • Keywords
    facility location; job shop scheduling; marine engineering; equipment allocation problem; exact mathematical model; integrated resource scheduling; job shop problem; machine scheduling problem; maritime logistics facility; math-heuristic approach; real-world integrated logistics problem; Job shop scheduling; Logistics; Optimal scheduling; Processor scheduling; Resource management; Roads; Schedules; job shop; math-heuristic; scheduling;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial Engineering and Engineering Management (IEEM), 2011 IEEE International Conference on
  • Conference_Location
    Singapore
  • ISSN
    2157-3611
  • Print_ISBN
    978-1-4577-0740-7
  • Electronic_ISBN
    2157-3611
  • Type

    conf

  • DOI
    10.1109/IEEM.2011.6117906
  • Filename
    6117906