• DocumentCode
    2854110
  • Title

    Commissioning and operational experience for the 135000 HP adjustable speed drive at NASA´s national transonic facility

  • Author

    Inge, JohnT ; Sydnor, George H. ; Lubasch, Ruediger ; Kobi, Heinz ; Bhatia, Ram ; Krattiger, Hansueli

  • Author_Institution
    NASA Langley Res. Center, Hampton, VA, USA
  • fYear
    1999
  • fDate
    36281
  • Firstpage
    694
  • Lastpage
    697
  • Abstract
    The world´s largest adjustable speed synchronous motor drive system is now operational at NASA´s National Transonic Facility (wind tunnel). The successful activation of this newly installed system was achieved through structured factory tests and a comprehensive commissioning plan. Data from the commissioning tests are presented. The tests validate the design, characterize the operational envelope, and demonstrate that performance requirements were met
  • Keywords
    commissioning; synchronous motor drives; variable speed drives; wind tunnels; 135000 hp; NASA; National Transonic Facility; adjustable speed drive; commissioning plan; commissioning requirements; commissioning results; commissioning tests; operational experience; performance requirements; structured factory tests; synchronous motor drive; wind tunnel; Conductors; Current transformers; Job shop scheduling; NASA; Nitrogen; Performance evaluation; Production facilities; Synchronous motors; System testing; Variable speed drives;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Electric Machines and Drives, 1999. International Conference IEMD '99
  • Conference_Location
    Seattle, WA
  • Print_ISBN
    0-7803-5293-9
  • Type

    conf

  • DOI
    10.1109/IEMDC.1999.769217
  • Filename
    769217