Title :
Genetic algorithm for the project scheduling problem with fuzzy time parameters
Author :
Huang, Yilun ; Shou, Yongyi ; Zhang, Linda
Author_Institution :
Dept. of Instrum. Sci. & Eng., Zhejiang Univ., Hangzhou, China
Abstract :
It is essential to allocate scarce resource and schedule the activities effectively so as to improve the project performance. Due to inherent uncertainties of the environment and activities, a mathematical model with fuzzy time parameters is adopted for the resource-constrained project scheduling problem. A genetic algorithm based on a fuzzy parallel schedule generation scheme is proposed. Two schemes of fuzzification are adopted for activity durations. Computational tests show that triangular fuzzy time parameters would be preferred.
Keywords :
fuzzy set theory; genetic algorithms; mathematical analysis; project management; resource allocation; scheduling; activity scheduling; fuzzy parallel schedule generation scheme; genetic algorithm; mathematical model; project performance; resource-constrained project scheduling problem; scarce resource allocation; triangular fuzzy time parameters; Biological cells; Genetic algorithms; Job shop scheduling; Processor scheduling; Schedules; Uncertainty; Project; fuzzy; genetic algorithm; scheduling;
Conference_Titel :
Industrial Engineering and Engineering Management (IEEM), 2011 IEEE International Conference on
Conference_Location :
Singapore
Print_ISBN :
978-1-4577-0740-7
Electronic_ISBN :
2157-3611
DOI :
10.1109/IEEM.2011.6118005