  • Abstract
    In 1993 the owner of the Val des Dir dam in Switzerland decided to increase the peak energy production by adding a new power station to the existing storage lake. In the article, the history of the project, the specification for the generators as well as the technical solution provided are described. Further on, the first results of the measurements done during commissioning are presented. The generators in the Bieudron power station are the world´s largest fully water cooled machines in operation
  • Keywords
    cooling; hydroelectric generators; hydroelectric power stations; rotors; stators; Bieudron Power Plant; Switzerland; Val des Dir dam; commissioning; generator design; generator specification; peak energy production increase; rotor design; stator design; water cooled hydro generators; Energy storage; Lakes; Power generation; Production; Reactive power; Rotors; Stator cores; Stator windings; Turbines; Water storage;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Electric Machines and Drives, 1999. International Conference IEMD '99
  • Conference_Location
    Seattle, WA
  • Print_ISBN
    0-7803-5293-9
  • Type

    conf

  • DOI
    10.1109/IEMDC.1999.769255
  • Filename
    769255