Title :
Test management with Testopia — missing link?
Author :
Fomin, Stanislav
Author_Institution :
Customized Inform Systems, USA
Abstract :
The subject of functional testing is not new. The unity of conceptions and methods has been reached. Thus it´s needed to manage requirements, test-cases, results of test runs for each program setup, it´s also needed to manage metrics, to see the testing of customer requirements, to analyze the frequency of found mistakes, to calculate problem sites, to manage the testing team and demonstrate the whole process to the customer. For these purposes the specialized system for test management is needed.
Keywords :
formal specification; formal verification; program testing; systems analysis; Testopia; functional testing; program testing; test management system; Automatic control; Automatic testing; Design automation; Instruments; Product development; Programming; Security; Software quality; Software testing; System testing; Bugzilla; Test management; Testopia;
Conference_Titel :
Software Engineering Conference in Russia (CEE-SECR), 2009 5th Central and Eastern European
Conference_Location :
Moscow
Print_ISBN :
978-1-4244-5664-2
Electronic_ISBN :
978-1-4244-5665-9
DOI :
10.1109/CEE-SECR.2009.5501152