• DocumentCode
    2898455
  • Title

    Status of the RIKEN RIB factory

  • Author

    Yano, Y.

  • Author_Institution
    RIKEN, Saitama
  • fYear
    2007
  • fDate
    25-29 June 2007
  • Firstpage
    700
  • Lastpage
    702
  • Abstract
    The first outcome from a newly operational RJ beam facility called the RIKEN RIB Factory was obtained in the first test experiment conducted in the last week of May 2007. A new very neutron-rich isotope, Pd-125 was discovered in the in-flight fission of U-238 isotopes accelerated up to 345 MeV/nucleon. Since 1997, RIKEN has been constructing this facility, where three new ring cyclotrons with K-values of 570 MeV, 980 MeV and 2600 MeV, respectively, boost energies of the output beams from the existing K540-MeV ring cyclotron up to 440 MeV/nucleon for light ions and 350 MeV/nucleon for very heavy ions. The K2600-MeV ring cyclotron is the world´s first ring cyclotron with superconducting sector magnets. These energetic heavy-ion beams are converted into intense RI beams via projectile fragmentation of stable isotopes or in-flight fission of uranium isotopes by a superconducting fragment separator.
  • Keywords
    accelerator magnets; cyclotrons; radioactive ion beams; superconducting magnets; 125Pd neutron-rich isotope; RIKEN RIB Factory; cyclotrons; electron volt energy 2600 MeV; electron volt energy 540 MeV; electron volt energy 980 MeV; in-flight 238U fission; projectile fragmentation; radioactive ion beam facility; superconducting fragment separator; superconducting sector magnets; Acceleration; Cyclotrons; Isotopes; Linear particle accelerator; Particle beams; Particle separators; Production facilities; Projectiles; Superconducting magnets; Testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 2007. PAC. IEEE
  • Conference_Location
    Albuquerque, NM
  • Print_ISBN
    978-1-4244-0916-7
  • Type

    conf

  • DOI
    10.1109/PAC.2007.4441105
  • Filename
    4441105