DocumentCode :
2963882
Title :
Construction Project Transaction Mode Comprehensive Evaluation Based on Stochastic Weight Assignment Method
Author :
Hong Wei-min ; Liu Hong-mei ; Chen Wei-wei ; Liu Shu-qing
Author_Institution :
Sch. of Civil Eng. & Archit., Nantong Univ., Nantong, China
fYear :
2011
fDate :
12-14 Aug. 2011
Firstpage :
1
Lastpage :
4
Abstract :
Considering the shortcomings of the attribute weight setting method used currently in the decision model of choosing project transaction mode, which is typically characterized by precise weights, the stochastic problem of index weight of multi-attribute comprehensive evaluation is researched. Under the weight interval information is chosen, the stochastic weight assignment method is used to determine the value of weight. Then, combined with Monte-Carlo simulation, which can analyze the impacts of changes of weights on comprehensive evaluation results to enhance the applicability of the model. At last, an real example is proposed to demonstrate such model and solution are efficient.
Keywords :
Monte Carlo methods; construction industry; project management; stochastic processes; Monte-Carlo simulation; attribute weight setting method; construction project transaction mode comprehensive evaluation; multiattribute comprehensive evaluation; stochastic weight assignment method; weight interval information; Analytical models; Contracts; Indexes; Monte Carlo methods; Probability; Resource management; Stochastic processes;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Management and Service Science (MASS), 2011 International Conference on
Conference_Location :
Wuhan
Print_ISBN :
978-1-4244-6579-8
Type :
conf
DOI :
10.1109/ICMSS.2011.5998203
Filename :
5998203
Link To Document :
بازگشت