• DocumentCode
    2964113
  • Title

    A Survey of Multi-Agent Methods for Solving Resource Constrained Project Scheduling Problems

  • Author

    Ren, Haiying ; Wang, Yuanyuan

  • Author_Institution
    Econ. & Manage. Sch., Beijing Univ. of Technol., Beijing, China
  • fYear
    2011
  • fDate
    12-14 Aug. 2011
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    In recent years, with the rapid increase in the complexity of project management, most traditional models for solving resource constrained project scheduling problems (RCPSP) can´t handle real-world project scheduling well, thus experts and scholars have developed several multi-agent based RCPSP models. In this paper, we first point out the advantage of multi-agent system in solving RCPSP. Then, we review representative multi-agent methods on resource constrained project scheduling. Finally, we propose some future research directions of the multi-agent methods solving these problems.
  • Keywords
    multi-agent systems; production engineering computing; project management; scheduling; RCPSP; multiagent method; project management; resource constrained project scheduling; Biological system modeling; Dynamic scheduling; Heuristic algorithms; Optimization; Processor scheduling; Schedules;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Management and Service Science (MASS), 2011 International Conference on
  • Conference_Location
    Wuhan
  • Print_ISBN
    978-1-4244-6579-8
  • Type

    conf

  • DOI
    10.1109/ICMSS.2011.5998217
  • Filename
    5998217