DocumentCode
2969978
Title
A GRASP algorithm for the two-machine flow-shop problem with weighted late work criterion and common due date
Author
Hasanzadeh, Amir ; Afshari, Hamid ; Kianfar, Kamran ; Fathi, Mehdi ; Jadid, Afshin Oroojlooy
Author_Institution
Dept. of Ind. Eng., Amirkabir Univ. of Technol., Tehran, Iran
fYear
2009
fDate
8-11 Dec. 2009
Firstpage
1930
Lastpage
1934
Abstract
In this paper, a metaheuristic approach for the two-machine flow-shop problem with a common due date and the weighted late work performance measure (F2|dj = d|Yw) are presented. The late work criterion estimates the quality of a solution with regard to the duration of the late parts of jobs, not taking into account the quantity of the delay for the fully late activities. Since the problem mentioned is known to be NP-hard, a trajectory methods, namely GRASP is proposed based on the special features of the case under consideration. Then, the results of computational experiments are reported, in which the metaheuristic solution is compared with exact approach and three other heuristic methods´ results.
Keywords
computational complexity; flow shop scheduling; optimisation; GRASP algorithm; NP-hard; common due date; metaheuristic approach; trajectory methods; two-machine flow-shop problem; weighted late work criterion; Control systems; Delay estimation; Environmental management; Industrial engineering; Information management; Job shop scheduling; Parallel machines; Processor scheduling; Production; Real time systems; Flow-Shop; GRASP; Late work criteria; Metaheuristic; Scheduling;
fLanguage
English
Publisher
ieee
Conference_Titel
Industrial Engineering and Engineering Management, 2009. IEEM 2009. IEEE International Conference on
Conference_Location
Hong Kong
Print_ISBN
978-1-4244-4869-2
Electronic_ISBN
978-1-4244-4870-8
Type
conf
DOI
10.1109/IEEM.2009.5373211
Filename
5373211
Link To Document