• DocumentCode
    2969978
  • Title

    A GRASP algorithm for the two-machine flow-shop problem with weighted late work criterion and common due date

  • Author

    Hasanzadeh, Amir ; Afshari, Hamid ; Kianfar, Kamran ; Fathi, Mehdi ; Jadid, Afshin Oroojlooy

  • Author_Institution
    Dept. of Ind. Eng., Amirkabir Univ. of Technol., Tehran, Iran
  • fYear
    2009
  • fDate
    8-11 Dec. 2009
  • Firstpage
    1930
  • Lastpage
    1934
  • Abstract
    In this paper, a metaheuristic approach for the two-machine flow-shop problem with a common due date and the weighted late work performance measure (F2|dj = d|Yw) are presented. The late work criterion estimates the quality of a solution with regard to the duration of the late parts of jobs, not taking into account the quantity of the delay for the fully late activities. Since the problem mentioned is known to be NP-hard, a trajectory methods, namely GRASP is proposed based on the special features of the case under consideration. Then, the results of computational experiments are reported, in which the metaheuristic solution is compared with exact approach and three other heuristic methods´ results.
  • Keywords
    computational complexity; flow shop scheduling; optimisation; GRASP algorithm; NP-hard; common due date; metaheuristic approach; trajectory methods; two-machine flow-shop problem; weighted late work criterion; Control systems; Delay estimation; Environmental management; Industrial engineering; Information management; Job shop scheduling; Parallel machines; Processor scheduling; Production; Real time systems; Flow-Shop; GRASP; Late work criteria; Metaheuristic; Scheduling;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial Engineering and Engineering Management, 2009. IEEM 2009. IEEE International Conference on
  • Conference_Location
    Hong Kong
  • Print_ISBN
    978-1-4244-4869-2
  • Electronic_ISBN
    978-1-4244-4870-8
  • Type

    conf

  • DOI
    10.1109/IEEM.2009.5373211
  • Filename
    5373211