DocumentCode
2970093
Title
Scheduling with uncertain processsing times: Applying β-robust schedule on two-machine flow-shop with constraints
Author
Ullah, Saif ; Liu, Qiong ; Zhang, Chaoyong ; Awan, Yasser Riaz
Author_Institution
State Key Lab. of Digital Manuf. Equip. & Technol., Huazhong Univ. of Sci. & Technol., Wuhan, China
fYear
2009
fDate
8-11 Dec. 2009
Firstpage
1946
Lastpage
1950
Abstract
Scheduling of jobs is momentous to augment production rate, reduce production expenses, trim down jobs completion times etc. However, changes in the sequence of jobs on machines as well as the uncertainties in actual processing times of jobs produces variations in the performance of flow-shop schedule. In these circumstances, the risk of attaining schedules´ performance level inferior than a certain limit is an imperative evaluator for the efficiency of jobs schedule. To muddle through the risk in two-machine flow-shop where total flow-time is considered as a performance measure, a constraint based Ã-robust schedule is anticipated to minimize the risk of exceeding total flow-time from a certain limit. The presented constraints are applied for scheduling of jobs in two-machine flow-shop of a manufacturing company in China. Result reveals that the proposed constraints yield a schedule with maximum probability of attaining total flow-time less than a threshold and the obtained schedule has minimum risk of exceeding total flow-time from a certain limit.
Keywords
flow shop scheduling; probability; risk management; constraint based Ã\x9f-robust schedule; job scheduling; manufacturing company; maximum probability; risk minimization; total flow-time; two-machine flow-shop scheduling; Chaos; Job production systems; Job shop scheduling; Laboratories; Manufacturing processes; Performance evaluation; Robustness; Single machine scheduling; System performance; Uncertainty; β-robust schedule; Flow-shop scheduling; Schedule performance; constraints; risk;
fLanguage
English
Publisher
ieee
Conference_Titel
Industrial Engineering and Engineering Management, 2009. IEEM 2009. IEEE International Conference on
Conference_Location
Hong Kong
Print_ISBN
978-1-4244-4869-2
Electronic_ISBN
978-1-4244-4870-8
Type
conf
DOI
10.1109/IEEM.2009.5373216
Filename
5373216
Link To Document