    The fabrication and preassembly of HT-7 Superconducting Tokamak

  • Author

    Gao, D.M. ; Li, J.M. ; Wang, S.R. ; Liu, X. ; Zhu, W.H. ; Xue, Y.H. ; Wu, J.F. ; Xu, X.F.

  • Author_Institution
    Inst. of Plasma Phys., Acad. Sinica, Anhui, China
  • Volume
    1
  • fYear
    1993
  • fDate
    11-15 Oct 1993
  • Firstpage
    341
  • Abstract
    The HT-7 Superconducting Tokamak is being built in Hefei, China. It is a device reconstructed and upgraded from T-7 Tokamak of Russia. This project is a co-operating item of fusion research between Russia and China. The Research and Manufacturing Center (RMC), ASIPP is responsible for the fabrication and assembly of HT-7. The design of HT-7 was carried out by both of Russian and Chinese engineers in 1991, and the main parts of the machine were fabricated in 1992. The preassembly of HT-7 was completed in April, 1993. This paper emphasizes on the manufacturing steps necessary to produce the HT-7 and a series of technological methods to overcome the key techniques
  • Keywords
    Tokamak devices; fusion reactor design; superconducting machines; HT-7 Superconducting Tokamak; T-7 Tokamak; fabrication; preassembly; Bellows; Cooling; Fabrication; High temperature superconductors; Manufacturing; Nitrogen; Plasma materials processing; Superconducting coils; Tokamaks; Welding;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Fusion Engineering, 1993., 15th IEEE/NPSS Symposium on
  • Conference_Location
    Hyannis, MA
  • Print_ISBN
    0-7803-1412-3
  • Type

    conf

  • DOI
    10.1109/FUSION.1993.518345
  • Filename
    518345