  • Abstract
    The first injector of the ASDEX Upgrade neutral beam system has been commissioned and injection experiments started in June 1993. Within a few weeks an injected power of 5.2 MW (H0), equivalent to 87% of the design power level, was achieved for pulse lengths of up to 1.5 seconds, and a variety of neutral beam heated discharges could be analyzed before the shutdown of ASDEX Upgrade in August
  • Keywords
    fusion reactor design; fusion reactor ignition; fusion reactor operation; fusion reactors; plasma beam injection heating; plasma toroidal confinement; 1.5 s; 5.2 MW; ASDEX Upgrade neutral beam system commissioning; ASDEX Upgrade shutdown; H; H0; design power level; first operation; fusion reactor; injection experiments; neutral beam heated discharges; Centralized control; Control systems; Heating; Ion sources; Particle beam injection; Power supplies; Power transformer insulation; Switches; Valves; Variable speed drives;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Fusion Engineering, 1993., 15th IEEE/NPSS Symposium on
  • Conference_Location
    Hyannis, MA
  • Print_ISBN
    0-7803-1412-3
  • Type

    conf

  • DOI
    10.1109/FUSION.1993.518370
  • Filename
    518370