DocumentCode
2984458
Title
Advanced quality planning issues
Author
Craig, Clark
Author_Institution
Molex Inc., Lisle, IL, USA
fYear
1989
fDate
18-20 Sep 1989
Firstpage
101
Abstract
Summary form only given. Activities prior to tooling were considered, including: (1) product design FMEA (identification of critical product characteristics, identification of major product characteristics, determination and justification of specification limits, determination of appropriate gaging techniques, and raw material requirements); (2) process FMEA, which encompasses all primary processes such as stamping, molding, plating, and assembly. Also considered were tool qualification (first article requirements, process potential study requirements, gage potential requirements, and long-term process qualification); and quality requirements (Cpk requirements, deviation from target, and quality as produced and shipped evaluation)
Keywords
electric connectors; management; manufacture; quality control; connectors manufacture; pre-tooling activities; process FMEA; product design FMEA; quality planning issues; quality requirements; tool qualification; Assembly; Product design; Qualifications; Raw materials; Steel;
fLanguage
English
Publisher
ieee
Conference_Titel
Electrical Contacts, 1989., Proceedings of the Thirty Fifth Meeting of the IEEE Holm Conference on
Conference_Location
Chicago, IL
Type
conf
DOI
10.1109/HOLM.1989.77926
Filename
77926
Link To Document