DocumentCode
2985145
Title
Research on Railway Project Material Procurement Plan Based on Inventory Coordination
Author
Xie You-wu
Author_Institution
1st Eng. Corp., China Railway Constr. 11 Bur. Group, Xiangfan, China
fYear
2011
fDate
12-14 Aug. 2011
Firstpage
1
Lastpage
4
Abstract
The importance of inventory coordination in dymamic demand was discussed, so was the process of allocating scheme, then the precondition of inventory modulation was presented. Considering the balance of supply cost and satisfactory, costs of united reorder and inventory modulation were researched in terms of inventory shortage, inventory excess and transportation cost. Advantages of united reorder and inventory modulation were synthesized and the optimized model of material allocating was constructed, also optimized allocation scheme was presented. At last a reasonable plan of example was present, which testified the practicability and validity of the scheme.
Keywords
inventory management; procurement; project management; railway engineering; dymamic demand; inventory coordination; inventory excess; inventory modulation; inventory shortage; optimized allocation scheme; railway project material procurement plan; supply cost; transportation cost; united reorder cost; Joints; Materials; Modulation; Predictive models; Procurement; Rail transportation; Supply chains;
fLanguage
English
Publisher
ieee
Conference_Titel
Management and Service Science (MASS), 2011 International Conference on
Conference_Location
Wuhan
Print_ISBN
978-1-4244-6579-8
Type
conf
DOI
10.1109/ICMSS.2011.5999315
Filename
5999315
Link To Document