DocumentCode :
2990377
Title :
Mobile Grid Task Scheduling Considering Resource Reliability
Author :
Lei Liu ; Chunlin Li
Author_Institution :
Dept. of Comput. Sci., Wuhan Univ. of Technol., Wuhan, China
fYear :
2009
fDate :
18-20 Jan. 2009
Firstpage :
1
Lastpage :
4
Abstract :
The mobile grid supports mobile user and mobile resource with additional features such as limited energy, unstable network connection, etc. The mobile resource is composed of mobile device and the resource reliability is greatly decreased, which affects the grid scheduling. In this paper, the resource reliability is defined, which is evaluated from task completion time and energy consumption, in order to solve the problems caused by mobile devices in the scheduling. Moreover, the grid tasks are divided into two categories: urgent task and non-urgent task, which adopt different ways to calculate the resource reliability. Then, the revised min-min algorithm is proposed, which concerns with the resource reliability. It aims to select the most reliable resource to execute the grid tasks and ensure successful scheduling. The research simulations suggest that it can effectively shorten the task completion time, reduce the resource energy consumption and guarantee the load balancing.
Keywords :
grid computing; mobile computing; reliability; resource allocation; scheduling; energy consumption; load balancing; mobile device; mobile grid task scheduling; mobile resource; mobile user; resource reliability; revised min-min algorithm; Algorithm design and analysis; Computer network reliability; Computer science; Energy consumption; Fault tolerance; Load management; Mobile computing; Processor scheduling; Quality of service; Scheduling algorithm;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Computer Network and Multimedia Technology, 2009. CNMT 2009. International Symposium on
Conference_Location :
Wuhan
Print_ISBN :
978-1-4244-5272-9
Type :
conf
DOI :
10.1109/CNMT.2009.5374742
Filename :
5374742
Link To Document :
بازگشت