• DocumentCode
    2995225
  • Title

    An integrated approach to reactive scheduling subject to machine breakdown

  • Author

    Wang, Y.F. ; Zhang, Y.F. ; Fuh, J.Y.H. ; Zhou, Z.D. ; Lou, P. ; Xue, L.G.

  • Author_Institution
    Dept. of Mech. Eng., Nat. Univ. of Singapore, Singapore
  • fYear
    2008
  • fDate
    1-3 Sept. 2008
  • Firstpage
    542
  • Lastpage
    547
  • Abstract
    An integrated approach to handle the disruption of machine breakdown is presented for the dynamic reactive scheduling problem. The proposed rescheduling approach is achieved in an iterative manner by exploring the process plan solution space of the jobs involved. An integrator module is used to link the process planning module and scheduling module. A heuristic rule is proposed to modify solution space in terms of constraints, which are fed back to the process planning module. The process planning and scheduling are then re-run to obtain a new plans/schedule solution. The process continues until a satisfactory result is obtained. A case study is presented to show the effectiveness of the proposed approach.
  • Keywords
    machine protection; machinery; maintenance engineering; scheduling; dynamic reactive scheduling; heuristic rule; integrator module; machine breakdown; process plan solution space; process planning module; scheduling module; Automation; Dynamic scheduling; Electric breakdown; Iterative methods; Job shop scheduling; Logistics; Manufacturing systems; Process planning; Production; Space exploration; integration of process planning and scheduling; machine breakdown; reactive scheduling;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Automation and Logistics, 2008. ICAL 2008. IEEE International Conference on
  • Conference_Location
    Qingdao
  • Print_ISBN
    978-1-4244-2502-0
  • Electronic_ISBN
    978-1-4244-2503-7
  • Type

    conf

  • DOI
    10.1109/ICAL.2008.4636210
  • Filename
    4636210