DocumentCode :
3001281
Title :
Hoist Scheduling for multi-part CHSP in complex lines´ configuration
Author :
El Amraoui, A. ; Manier, M. -A ; El Moudni, A. ; Benrejeb, M.
Author_Institution :
Lab. Syst. et Transp., Univ. de Technol. Belfort-Montbeliard (UTBM), Belfort, France
fYear :
2011
fDate :
14-16 March 2011
Firstpage :
270
Lastpage :
275
Abstract :
The performance of an enterprise largely depends on the schedule of its resources. A good schedule may increase the output rate and reduce the production costs. Therefore, in this paper, we consider the cyclic schedule of hoist activities in automated electroplating lines which is commonly known as Cyclic Hoist Scheduling Problem (CHSP). The CHSPs appear in the manufacturing facilities to achieve a mass production and to search a repetitive sequence of moves for the hoist. In such kind of lines, hoist is used for moving electroplates through a line of tanks containing chemical baths. In this paper, we extend our elaborated 2-degree cyclic linear model to a more complex configuration of the production lines.
Keywords :
electroplating; hoists; mass production; production control; 2-degree cyclic linear model; automated electroplating line; chemical bath; cyclic hoist scheduling problem; manufacturing facilities; mass production; multipart CHSP; production line configuration; resource scheduling; Chemicals; Job shop scheduling; Load modeling; Loading; Schedules;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industrial Technology (ICIT), 2011 IEEE International Conference on
Conference_Location :
Auburn, AL
ISSN :
Pending
Print_ISBN :
978-1-4244-9064-6
Type :
conf
DOI :
10.1109/ICIT.2011.5754385
Filename :
5754385
Link To Document :
بازگشت