DocumentCode
300899
Title
IFE chamber technology testing program in NIF and chamber development test plan
Author
Abdou, Mohamed A.
Author_Institution
Dept. of Mech. Aerosp. & Eng., California Univ., Los Angeles, CA, USA
Volume
1
fYear
1995
fDate
30 Sep-5 Oct 1995
Firstpage
7
Abstract
Issues concerning chamber technology testing program in NIF involving: criteria for evaluation/prioritization of experiments, engineering scaling requirements for test article design and material selection and R&D plan prior to NIF testing were addressed in this paper. In order to maximize the benefits of testing program in NIF, the testing in NIF should provide the experimental data relevant to DEMO design choice or to DEMO design predictive capability by utilizing engineering scaling test article designs. Test plans were developed for 2 promising chamber design concepts. Early testing in non-fusion/non-ignition prior to testing in ignition facility serves a critical role in chamber R&D test plans in order to reduce the risks and costs of the more complex experiments in NIF
Keywords
fusion reactor design; plasma inertial confinement; DEMO design; IFE chamber technology testing program; NIF; chamber development test plan; engineering scaling; nonfusion/nonignition; test article design; Aerospace engineering; Aerospace materials; Aerospace testing; Design engineering; Ignition; Materials testing; Protection; Research and development; System testing; X-rays;
fLanguage
English
Publisher
ieee
Conference_Titel
Fusion Engineering, 1995. SOFE '95. Seeking a New Energy Era., 16th IEEE/NPSS Symposium
Conference_Location
Champaign, IL
Print_ISBN
0-7803-2969-4
Type
conf
DOI
10.1109/FUSION.1995.534163
Filename
534163
Link To Document