Title
An Integrated Model of Eliminating Early Failures for Flexible Manufacturing System
Author
Genbao Zhang ; Jian Liu ; Dongying Li
Author_Institution
Sch. of Mech. Eng., Chongqing Univ., Chongqing, China
fYear
2013
fDate
29-30 June 2013
Firstpage
165
Lastpage
170
Abstract
To eliminate the early failures and improve the reliability of flexible manufacturing system (FMS), the model of eliminating early failures for FMS is proposed in this paper. Firstly, Weibull two-fold mixture model is chose to establish the bathtub curve model of FMS, and division between early failure phase and normal operation phase is identified. Secondly, the formation of early failures and mechanism of early failures elimination are studied, and an integrated model of eliminating early failures for FMS is established, with some specific process and implementation of reliability design and analysis layer, reliability test layer and early failures elimination layer. Finally, an example of key function unit in FMS is shown to illustrate the applicability and validity of the model.
Keywords
Weibull distribution; flexible manufacturing systems; reliability; FMS; Weibull two-fold mixture model; bathtub curve model; early failure elimination layer; early failure phase; flexible manufacturing system; key function unit; normal operation phase; reliability test layer; Automation; Manufacturing; bathtub curve; early failures; flexible manufacturing system; reliability analysis; reliability test;
fLanguage
English
Publisher
ieee
Conference_Titel
Digital Manufacturing and Automation (ICDMA), 2013 Fourth International Conference on
Conference_Location
Qingdao
Type
conf
DOI
10.1109/ICDMA.2013.39
Filename
6597958
Link To Document