• DocumentCode
    3023601
  • Title

    An Integrated Model of Eliminating Early Failures for Flexible Manufacturing System

  • Author

    Genbao Zhang ; Jian Liu ; Dongying Li

  • Author_Institution
    Sch. of Mech. Eng., Chongqing Univ., Chongqing, China
  • fYear
    2013
  • fDate
    29-30 June 2013
  • Firstpage
    165
  • Lastpage
    170
  • Abstract
    To eliminate the early failures and improve the reliability of flexible manufacturing system (FMS), the model of eliminating early failures for FMS is proposed in this paper. Firstly, Weibull two-fold mixture model is chose to establish the bathtub curve model of FMS, and division between early failure phase and normal operation phase is identified. Secondly, the formation of early failures and mechanism of early failures elimination are studied, and an integrated model of eliminating early failures for FMS is established, with some specific process and implementation of reliability design and analysis layer, reliability test layer and early failures elimination layer. Finally, an example of key function unit in FMS is shown to illustrate the applicability and validity of the model.
  • Keywords
    Weibull distribution; flexible manufacturing systems; reliability; FMS; Weibull two-fold mixture model; bathtub curve model; early failure elimination layer; early failure phase; flexible manufacturing system; key function unit; normal operation phase; reliability test layer; Automation; Manufacturing; bathtub curve; early failures; flexible manufacturing system; reliability analysis; reliability test;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Digital Manufacturing and Automation (ICDMA), 2013 Fourth International Conference on
  • Conference_Location
    Qingdao
  • Type

    conf

  • DOI
    10.1109/ICDMA.2013.39
  • Filename
    6597958