    An optimization-based production scheduling system: progress report

  • Author

    Yoneda, Kiyoshi ; Hasegawa, Tetsuo ; Kano, Toshiyuki ; Kyoya, Yuji ; Nagahora, Takaaki ; Tsuji, Makoto ; Luh, Peter B. ; Gou, Ling ; Zhang, Yuanhui

  • Author_Institution
    Res. & Dev. Center, Toshiba Corp., Kawasaki, Japan
  • Volume
    3
  • fYear
    1996
  • fDate
    11-13 Dec 1996
  • Firstpage
    2387
  • Abstract
    This is an update report on a project which embeds an optimization-based scheduling system into a traditional factory. The factory manufactures tanks for gas insulated switchgears. Mathematical aspects of an earlier version of the scheduler designed for this project has been reported in CDC ´95. A lesson learned at a considerable cost has been the importance of methodical acquisition of problem specifications. Deployability of the present scheduling methodology to other factories has surfaced as an issue for the immediate future
  • Keywords
    gas insulated switchgear; operations research; optimisation; production control; deployability; factory; gas insulated switchgears; optimization; problem specifications; production control; production scheduling; tank manufacturing; Costs; Finishing; Job shop scheduling; Lagrangian functions; Machining; Manufacturing processes; Production facilities; Production systems; Research and development; Switchgear;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Decision and Control, 1996., Proceedings of the 35th IEEE Conference on
  • Conference_Location
    Kobe
  • ISSN
    0191-2216
  • Print_ISBN
    0-7803-3590-2
  • Type

    conf

  • DOI
    10.1109/CDC.1996.573445
  • Filename
    573445