• DocumentCode
    3079147
  • Title

    Scheduling manufacturing systems with work-in-process inventory

  • Author

    Bai, S.X. ; Gershwin, S.B.

  • Author_Institution
    MIT, Cambridge, MA, USA
  • fYear
    1990
  • fDate
    5-7 Dec 1990
  • Firstpage
    557
  • Abstract
    A real-time feedback control algorithm is developed for scheduling manufacturing systems in which there are three important classes of activities: operations, failures, and starvation or blockage. The scheduling objectives are to keep the actual production as close to the demand as possible, and to keep the level of work-in-process (WIP) inventory as low as possible. The processing time for each operation is deterministic. Failure and repair times are random. Whenever a machine fails or is starved or blocked, the scheduling system recalculates the short term production rates. Using the relationship between system capacity and starvation or blockage, desirable buffer levels and buffer sizes are found. Consequently, the WIP distribution in the system is defined. The production control policy is determined to meet the system performance requirements concerning low WIP inventory and tardiness. The results from the simple case are extended to multiple-part type and then reentrant systems
  • Keywords
    feedback; production control; scheduling; stock control; blockage; feedback; manufacturing systems; production control; production rates; real-time; repair times; scheduling; starvation; stock control; system performance; tardiness; work-in-process inventory; Fabrication; Job shop scheduling; Laboratories; Manufacturing systems; Operations research; Paper technology; Production facilities; Production systems; Productivity; Pulp manufacturing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Decision and Control, 1990., Proceedings of the 29th IEEE Conference on
  • Conference_Location
    Honolulu, HI
  • Type

    conf

  • DOI
    10.1109/CDC.1990.203658
  • Filename
    203658