DocumentCode
3083476
Title
Implementation of Backward Recovery Mechanism in Preemptive Utility Accrual Real Time Scheduling Algorithm
Author
Ahmad, Idawaty ; Othman, Muhammad Fauzan
Author_Institution
Dept. of Commun. Technol. & Network, Univ. Putra Malaysia, Serdang, Malaysia
fYear
2010
fDate
22-23 Sept. 2010
Firstpage
125
Lastpage
129
Abstract
This paper proposed a robust algorithm named as Backward Recovery Preemptive Utility Accrual Scheduling (BRPUAS). The proposed algorithm solved the abortion problem in the existing TUF/UA scheduling paradigm known as ARPUAS that only considers the abortion recovery as their fault recovery solution. BRPUAS enables the re-execution of the affected tasks rather than abortion to reduce the number of aborted tasks. It ensures the correctness of the executed tasks in the best effort basis in such a way that the infeasible tasks are aborted and produced zero utility, while the feasible tasks are re-executed to produce positive utility and consequently maximizing the total accrued utility to the system. Simulation results revealed that the BRPUAS achieved higher accrued utility compared to the ARPUAS for the entire load range, making it more reliable and efficient for adaptive real time application domain.
Keywords
real-time systems; scheduling; ARPUAS; TUF-UA scheduling paradigm; abortion recovery; backward recovery mechanism; executed tasks; fault recovery solution; feasible tasks; preemptive utility accrual real time scheduling algorithm; Algorithm design and analysis; Error analysis; Real time systems; Scheduling; Scheduling algorithm; Transient analysis; Error Recovery; Real Time System; TUF/UA Scheduling;
fLanguage
English
Publisher
ieee
Conference_Titel
Network Applications Protocols and Services (NETAPPS), 2010 Second International Conference on
Conference_Location
Kedah
Print_ISBN
978-1-4244-8048-7
Electronic_ISBN
978-0-7695-4177-8
Type
conf
DOI
10.1109/NETAPPS.2010.30
Filename
5635656
Link To Document