Research on resource leveling problem under resource constrained condition
Author
Wang, Qiang ; Qi, Jian-Xun
Author_Institution
Dept. of Bus. Manage., North China Electr. Power Univ., Beijing, China
Volume
2
fYear
2009
fDate
12-15 July 2009
Firstpage
901
Lastpage
906
Abstract
In this paper, a new problem is defined according to the actual project requirement. It is resource leveling problem under resource constrained condition. Unlike the single resource leveling problem, or the resource constrained scheduling problem, this new problem will consider not only resource usage evenness, but also the shortest project duration under resource constrained condition. A new objective function is designed and a particle swarm optimization (PSO) algorithm is presented to solve this problem.
Keywords
particle swarm optimisation; project management; scheduling; objective function; particle swarm optimization algorithm; project requirement; resource constrained scheduling problem; resource leveling problem; Algorithm design and analysis; Conference management; Cybernetics; Dynamic programming; Energy management; Machine learning; Mathematical programming; Particle swarm optimization; Project management; Resource management; Heuristic methods; Particle swarm optimization; Project management; Project scheduling; RCP scheduling problem; Resource leveling problem;
fLanguage
English
Publisher
ieee
Conference_Titel
Machine Learning and Cybernetics, 2009 International Conference on
Conference_Location
Baoding
Print_ISBN
978-1-4244-3702-3
Electronic_ISBN
978-1-4244-3703-0
Type
conf
DOI
10.1109/ICMLC.2009.5212393
Filename
5212393
Link To Document