    Research on resource leveling problem under resource constrained condition

  • Author

    Wang, Qiang ; Qi, Jian-Xun

  • Author_Institution
    Dept. of Bus. Manage., North China Electr. Power Univ., Beijing, China
  • Volume
    2
  • fYear
    2009
  • fDate
    12-15 July 2009
  • Firstpage
    901
  • Lastpage
    906
  • Abstract
    In this paper, a new problem is defined according to the actual project requirement. It is resource leveling problem under resource constrained condition. Unlike the single resource leveling problem, or the resource constrained scheduling problem, this new problem will consider not only resource usage evenness, but also the shortest project duration under resource constrained condition. A new objective function is designed and a particle swarm optimization (PSO) algorithm is presented to solve this problem.
  • Keywords
    particle swarm optimisation; project management; scheduling; objective function; particle swarm optimization algorithm; project requirement; resource constrained scheduling problem; resource leveling problem; Algorithm design and analysis; Conference management; Cybernetics; Dynamic programming; Energy management; Machine learning; Mathematical programming; Particle swarm optimization; Project management; Resource management; Heuristic methods; Particle swarm optimization; Project management; Project scheduling; RCP scheduling problem; Resource leveling problem;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Machine Learning and Cybernetics, 2009 International Conference on
  • Conference_Location
    Baoding
  • Print_ISBN
    978-1-4244-3702-3
  • Electronic_ISBN
    978-1-4244-3703-0
  • Type

    conf

  • DOI
    10.1109/ICMLC.2009.5212393
  • Filename
    5212393