DocumentCode
3109554
Title
Single loss of phase tests at 33 kV on operating windfarms
Author
Nicholson, G.D.
Author_Institution
Econnect Ltd., UK
fYear
1996
fDate
35353
Firstpage
42552
Lastpage
42559
Abstract
The tests presented are a few of those carried out at a number of windfarms in the UK. In the short time and space available the full test procedures have not been detailed. Certain interesting and key tests have been selected for explanation and discussion. All the tests concern wind turbines with induction generators. All the windfarms are connected at 33 kV and use 33 kV/LV transformers at each turbine. LV voltages are 480 or 690 V in different cases. In Example Tests Nos.1-3 the single phasing was achieved by jumpering the PES´s outdoor 33 kV circuit breaker on 2 phases at the windfarm substation. The VT to which the protection relays were connected lies on the busbars between the PES breaker and the customer breaker(s). In Example Test No.4 a 33 kV load break air switch was installed in the windfarm cable system, so that the supply to the single transformer and turbine could be broken on one phase whilst the turbine was either stopped or running. A 33 kV/110 V VT was connected on the transformer side of the switch to enable HV voltages to be measured
Keywords
wind power plants; 33 kV; 480 V; 690 V; HV measurement; induction generators; load break air switch; loss of phase tests; operating windfarms; outdoor circuit breaker; protection relays; single phasing; transformers; wind turbines; windfarm cable system;
fLanguage
English
Publisher
iet
Conference_Titel
Embedded Generation on Distribution Networks (Digest No. 1996/194), IEE Colloquium on the Impact of
Conference_Location
London
Type
conf
DOI
10.1049/ic:19961087
Filename
600681