DocumentCode
3133307
Title
Business constraints drive test decisions planning, partnerships and success
Author
Campbell, Michael
fYear
2005
fDate
8-8 Nov. 2005
Lastpage
1278
Abstract
In the era of complex SOC semiconductors, the test matrices and complexity of system, manufacturing and pre-silicon design test analysis are continuously evolving, as are the demands of the customers for improved quality at reduced cost. Business constraints that drive test solutions can make or break products, if not companies, in today´s market. Business constraints, namely cost and time to market, require that we strengthen and enlarge the current model for inter-company cooperation and development. This calls for improving existing systems modeling capabilities to achieve the reliability and predictability these systems models have the potential to offer. Significant advancements have been made; however, for full optimization of test cost and product quality, more is needed
Keywords
electron device testing; management science; planning; quality management; reliability; technology management; test facilities; SOC semiconductors; business constraints; business partnerships; design test analysis; inter-company cooperation; product quality; test decisions planning; test matrices; Business; Circuit testing; Costs; Design optimization; Electronic design automation and methodology; Semiconductor device manufacture; Semiconductor device testing; Software testing; System testing; Time to market;
fLanguage
English
Publisher
ieee
Conference_Titel
Test Conference, 2005. Proceedings. ITC 2005. IEEE International
Conference_Location
Austin, TX
Print_ISBN
0-7803-9038-5
Type
conf
DOI
10.1109/TEST.2005.1584106
Filename
1584106
Link To Document