• DocumentCode
    3159396
  • Title

    A fast technique for unit commitment problem by extended priority list

  • Author

    Senjyu, Tomonobu ; Shimabukuro, Kai ; Uezato, Katsumi ; Funabashi, Toshihisa

  • Author_Institution
    Dept. of Electr. & Electron. Eng., Ryukyus Univ., Okinawa, Japan
  • Volume
    1
  • fYear
    2002
  • fDate
    6-10 Oct. 2002
  • Firstpage
    244
  • Abstract
    This paper introduces a new unit commitment problem, adapting the extended priority list (EPL) method. The EPL method consists of two steps, in the first step we get rapidly some initial unit commitment problem schedules by priority list (PL) method. At this step, operational constraints are disregarded. In the second step unit schedule is modified using the problem specific heuristics to fulfill operational constraints. To calculate efficiently, however, note that some heuristics are applied only to solutions where improvement is expected. Several numerical examples demonstrate the effectiveness of proposed method.
  • Keywords
    power generation scheduling; extended priority list; initial unit commitment problem schedules; operational constraints; priority list method; unit commitment; Costs; Lagrangian functions; Large-scale systems; Marketing and sales; Page description languages; Power industry; Power supplies; Power system planning; Power systems; Scheduling;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Transmission and Distribution Conference and Exhibition 2002: Asia Pacific. IEEE/PES
  • Print_ISBN
    0-7803-7525-4
  • Type

    conf

  • DOI
    10.1109/TDC.2002.1178301
  • Filename
    1178301