DocumentCode
3169883
Title
Timing system for neutral beam injection on the DIII-D tokamak
Author
Bramson, G.
Author_Institution
General Atomics, San Diego, CA, USA
fYear
1991
fDate
30 Sep-3 Oct 1991
Firstpage
814
Abstract
The author describes recent modifications to the DIII-D central timing system hardware and software to allow more flexible and complex timing waveforms than previously available to control NB (neutral beam) injection. In the past, for each plasma discharge, the start time and the pulse duration for each NB source could be set. The new NB timing system allows the experimental session leader to specify more than one pulse for each NB source to make efficient use of multiple physics experiments in a single discharge. Also, pulse trains with programmable duty cycles can be independently specified for each NB source to make NB injection a more useful diagnostic tool. Experimental results using features of the new NB timing system are presented
Keywords
Tokamak devices; fusion reactor instrumentation; fusion reactor theory and design; timing circuits; DIII-D central timing system hardware; neutral beam injection; plasma discharge; programmable duty cycles; pulse trains; software; timing waveforms; Centralized control; Control systems; Fault location; Hardware; Niobium; Particle beam injection; Plasma sources; Software systems; Timing; Tokamaks;
fLanguage
English
Publisher
ieee
Conference_Titel
Fusion Engineering, 1991. Proceedings., 14th IEEE/NPSS Symposium on
Conference_Location
San Diego, CA
Print_ISBN
0-7803-0132-3
Type
conf
DOI
10.1109/FUSION.1991.218723
Filename
218723
Link To Document