• DocumentCode
    3178303
  • Title

    Research on dual-resource multi-objective flexible job shop scheduling under uncertainty

  • Author

    Lang, Maotao ; Li, Hua

  • Author_Institution
    Sch. of Econ. & Manage., Xidian Univ., Xi´´an, China
  • fYear
    2011
  • fDate
    8-10 Aug. 2011
  • Firstpage
    1375
  • Lastpage
    1378
  • Abstract
    The actual flexible job-shop scheduling problem usually involves multiple objectives optimization, more than one resource constraint and uncertain operation time. The model of dual-resource multi-objective flexible job shop scheduling problem, which considers dual-resource constraints of machines and workers and uncertain operation time constraint, is established, and it takes delivery satisfaction, cost, energy consumption and noise pollution as the optimized objects based upon the actual situation of flexible job shop. Then, an algorithm that combines grey simulation technology and non-dominated sorting genetic algorithm II (NSGA-II) is designed according to the character of the model, and the algorithm process is presented.
  • Keywords
    energy consumption; genetic algorithms; grey systems; job shop scheduling; noise pollution; NSGA-II; dual-resource multiobjective flexible job shop scheduling; energy consumption; grey simulation technology; multiple objectives optimization; noise pollution; nondominated sorting genetic algorithm II; resource constraint; uncertain operation time; Energy consumption; Job shop scheduling; Mathematical model; Noise; Programming; Stochastic processes; Dual-resource Multi-objective Optimization; Flexible Job-shop Scheduling; Grey Simulation; NSGA-II; Uncertainty;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Artificial Intelligence, Management Science and Electronic Commerce (AIMSEC), 2011 2nd International Conference on
  • Conference_Location
    Deng Leng
  • Print_ISBN
    978-1-4577-0535-9
  • Type

    conf

  • DOI
    10.1109/AIMSEC.2011.6010821
  • Filename
    6010821