DocumentCode
3182756
Title
Notice of Retraction
The current situation and interaction mechanism research of Coal Mine´s EIA and Environmental acceptance
Author
Gang Liang
Author_Institution
Coll. of Geosci. & Surveying Eng., China Univ. of Min. & Technol., Beijing, China
fYear
2011
fDate
8-10 Aug. 2011
Firstpage
2495
Lastpage
2498
Abstract
Notice of Retraction
After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE´s Publication Principles.
We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper.
The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org.
EIA (Environmental impact assessment) and environmental acceptance both are important part of coal mine´s environmental management. The demands in EIA period are materials particular in environmental acceptance period. Then environmental acceptance can feed back important informations to EIA. Currently, there is less interaction between these two areas. This article analyzed the current situation and existing problems of Coal Mine´s EIA and Environmental Acceptance, and proposed the establishment of an interactive mechanism.
After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE´s Publication Principles.
We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper.
The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org.
EIA (Environmental impact assessment) and environmental acceptance both are important part of coal mine´s environmental management. The demands in EIA period are materials particular in environmental acceptance period. Then environmental acceptance can feed back important informations to EIA. Currently, there is less interaction between these two areas. This article analyzed the current situation and existing problems of Coal Mine´s EIA and Environmental Acceptance, and proposed the establishment of an interactive mechanism.
Keywords
coal; environmental factors; mining; coal mine; environmental acceptance period; environmental impact assessment; environmental management; interactive mechanism; Coal; Coal mining; Fuel processing industries; Inspection; Pollution measurement; Water conservation; Water resources; Acceptance; Coal Mine; EIA; Interaction Mechanism;
fLanguage
English
Publisher
ieee
Conference_Titel
Artificial Intelligence, Management Science and Electronic Commerce (AIMSEC), 2011 2nd International Conference on
Conference_Location
Dengleng
Print_ISBN
978-1-4577-0535-9
Type
conf
DOI
10.1109/AIMSEC.2011.6011075
Filename
6011075
Link To Document